15–20 Nov 2026
Hotel Aomori
Asia/Tokyo timezone

Reliability Improvements for LHC Cryogenic Instrumentation and Control through Preventive Maintenance and Fault Tracking

19 Nov 2026, 14:00
30m
Hotel Aomori

Hotel Aomori

1-1-23 Tsutsumi-machi, Aomori-shi, Aomori, Japan

Speaker

Boyan Naydenov (CERN)

Description

During Run 3 (2022 – 2026), the Large Hadron Collider (LHC) cryogenic system achieved an overall availability of 98.4%. Instrumentation and control equipment associated with the cryogenic plants was identified as one of the main contributors to the cryogenics system downtime. This presentation analyses the instrumentation and control failures that occurred during the run and examines how these and the corresponding repair activities are recorded in the operational database. Based on this analysis, improvements to the existing fault-tracking environment are proposed, with the aim of increasing system reliability through more systematic failure tracking and targeted preventive maintenance.

Authors

Presentation materials

There are no materials yet.