15–20 Nov 2026
Hotel Aomori
Asia/Tokyo timezone

Session

Integrated Reliability across accelerator sub-systems – Importance of robust interface definition

20 Nov 2026, 08:30
Hotel Aomori

Hotel Aomori

1-1-23 Tsutsumi-machi, Aomori-shi, Aomori, Japan

Conveners

Integrated Reliability across accelerator sub-systems – Importance of robust interface definition

  • Duane Newhart (Facility for Rare Isotope Beams (FRIB/MSU) - JLab)

Presentation materials

There are no materials yet.

  1. Melissa Harvey (Oak Ridge National Laboratory - Spallation Neutron Source)
    20/11/2026, 08:30
    Integrated Reliability across accelerator sub-systems – Importance of robust interface definition
    Oral

    At the Spallation Neutron Source (SNS), the proton accumulator ring concentrates technical risk in the injection region, where the electron catcher (e-catcher) removes secondary electrons generated during H⁻ stripping to protect nearby components and maintain stable operation. Following Proton Power Upgrade (PPU) modifications, the e-catcher failed on first beam operation due to insufficient...

    Go to contribution page
  2. Hitoshi Tanaka (RIKEN SPring-8 Center)
    20/11/2026, 09:00
    Integrated Reliability across accelerator sub-systems – Importance of robust interface definition
    Oral

    The accelerator facility in Harima consists of the CW ring-type light source “SPring-8,” which has been in operation for more than 30 years, and the relatively new X-ray free-electron laser (XFEL) “SACLA.” The aging SPring-8 is scheduled to shut down in the summer of 2027 and undergo a massive upgrade involving a complete replacement of its accelerators, transforming it into...

    Go to contribution page
  3. Rafael Xavier da Silveira (European Spallation Source)
    20/11/2026, 09:30
    Integrated Reliability across accelerator sub-systems – Importance of robust interface definition
    Oral

    Modern accelerator facilities are increasingly developed through distributed collaborations involving multiple teams, institutions, and external suppliers. While individual subsystems are often designed to high technical standards, many integration issues originate at the interfaces between them rather than within the subsystems themselves.
    Ambiguous ownership, incomplete interface...

    Go to contribution page
Building timetable...