15–20 Nov 2026
Hotel Aomori
Asia/Tokyo timezone

Session

Beyond Firefighting: Implemented Lessons Learned for Improved Reliability

17 Nov 2026, 08:30
Hotel Aomori

Hotel Aomori

1-1-23 Tsutsumi-machi, Aomori-shi, Aomori, Japan

Conveners

Beyond Firefighting: Implemented Lessons Learned for Improved Reliability

  • Martin Carroll (European Spallation Source)

Presentation materials

There are no materials yet.

  1. Christopher Zimmer (SLAC National Accelerator Laboratory)
    17/11/2026, 08:30
    Beyond Firefighting: Implemented Lessons Learned for Improved Reliability
    Oral

    The Linac Coherent Light Source facility comprises a normal-conducting linear accelerator and a newly commissioned superconducting linear accelerator, both capable of multiplexed electron beam delivery to two independent undulator lines. Maintaining stable and reproducible accelerator performance in this environment has often required reactive troubleshooting to address recurring operational...

    Go to contribution page
  2. Mr Siegfried Koepke (DESY Deutsches Elektronen Synchrotron)
    17/11/2026, 09:00
    Oral

    The availability of accelerators is a critical success factor for scientific research institutions.
    Reliable operational processes and their continuous optimization are key drivers. Both aspects are an integral part of a comprehensive quality management (QM).
    This presentation demonstrates that systematic process management, along with the implementation of operational lessons learned,...

    Go to contribution page
  3. Martin Pieck (Los Alamos National Laboratory)
    17/11/2026, 09:30
    Oral

    Mature accelerator facilities are often highly effective at restoring operation after failures, yet repeated reliance on experienced personnel and rapid technical fixes can unintentionally reinforce a reactive “firefighting” culture. At the 54-year-old Los Alamos Neutron Science Center (LANSCE), operational experience has motivated a broader approach: systematically converting failures,...

    Go to contribution page
Building timetable...